Skip to content
← All essays

Solar operations and humanitarian planning

What Happens After a Homeowner Signs a Solar Contract?

Why ArkData and Ark Humanitarian Group's water plans are built around what happens after someone says yes.

By , founder and CEO, Ark Data LLCPublished November 24, 2026Revised November 25, 20265 min read

Follow a homeowner from the moment they sign a solar contract to the first useful update. After the yes come the site survey, the system design, the permit, the utility's approval to connect, the install crew, the inspection, and the follow-up call when something doesn't work as expected. A different person owns almost every step, and the customer is watching all of them.

By then the salesperson has usually moved on to the next kitchen table. Noah Riley Monks, who sold and managed residential solar in Texas before founding ArkData, thinks about that gap. The person who made the promise is rarely the person who keeps it, so the promise has to be written down clearly enough to survive the trip.

What the numbers say

In 2022, researchers at the National Renewable Energy Laboratory studied 199,665 residential solar contracts signed with four medium-to-large installers from 2017 through 2019. Across all of them, 51% never became installed systems. They were cancelled, or they sat for more than six months with no progress. The typical installer did better than that pooled figure: the median was 33%, and the four ranged from 23% to 55%.

The records are early-stage: they show when each contract's last recorded activity occurred, not why it ended. Two details stand out. Of the contracts that failed, 73% stopped before a permit application was ever submitted. For 72% of them, the last recorded activity came within a week of signing. The project went quiet almost as soon as the salesperson left.

The researchers also estimated that failed contracts add about 20 cents per watt to an installer's costs, roughly $1,400 on a 7-kilowatt system, and noted that those costs are often passed on to the customers who do go solar. Monks is careful here: the data didn't record why each contract failed, and the researchers found no single cause. What the numbers show is when the risk is highest, in the first days after the yes, before much has been recorded at all.

First-week follow-up

Monks's recommendation is to own the first week. Decide who calls the customer after the signature, on what day, and what they say. A customer who knows exactly what happens next has less reason to go quiet. Three rules he took from the solar years: a promise made in the sale is a work order for someone else; the first week belongs to the customer; and a team that celebrates working systems, not just signatures, gets customers who are glad they signed.

Before the first call ends

A homeowner should know three things before the first follow-up call ends: who owns the next step, when they will hear back, and where to go if it slips. If a company can answer those in the first week, it has turned a signature into the start of a service instead of the start of a silence.

Noah Riley Monks is the founder and CEO of Ark Data LLC and chairman of the board of directors and CEO of Ark Humanitarian Group. Before ArkData, he worked in residential solar sales and operations in Texas.

Adapted from an original essay by . Published by Humanitarian Journal.

Keep reading

All essays